/moai run

UPDATED 2026-08-18 13 min read EDIT ON GITHUB ↗

The Run-phase command that implements code based on the SPEC document. Depending on the project state, either the TDD (RED-GREEN-REFACTOR) or DDD (ANALYZE-PRESERVE-IMPROVE) cycle applies; this document focuses on the DDD cycle, which safely improves existing code.

Info
Slash command: In Claude Code, type /moai:run to run this command directly. Typing just /moai shows the list of all available subcommands.

Overview

/moai run is the Phase 2 (Run) command of the MoAI-ADK workflow. It reads the SPEC document created in Phase 1 and implements the code safely through the ANALYZE-PRESERVE-IMPROVE cycle without breaking existing functionality. Internally, the manager-develop agent manages the entire process.

The implementation phase consumes the most tokens in the 3-Phase pipeline. That is why the v3 tokenomics design is concentrated here — auto-loading the SPEC summary (spec-compact.md) saves ~30% of tokens, Harness Level Routing adjusts verification depth by SPEC complexity to cut unnecessary audit cost, and progress is saved to files so you can resume even if the session drops.

Info

Understanding DDD as a home renovation

The DDD ANALYZE-PRESERVE-IMPROVE cycle is like renovating a house:

StageAnalogyActual work
ANALYZEInspecting the houseUnderstand the current code structure and issues
PRESERVEPhotographing the current stateRecord existing behavior with characterization tests
IMPROVERenovating room by roomImprove gradually while keeping tests passing

Just as demolishing the whole house at once is dangerous, code is safest when you change it a little at a time and verify each step.

Usage

Pass the SPEC ID created in the Plan phase as an argument:

bash
# Always run /clear after completing the Plan phase
> /clear

# Start implementation with a SPEC ID
> /moai run SPEC-AUTH-001
Warning
Always run /clear before /moai run. Cleaning up the tokens used in the Plan phase lets the Run phase use the full 200K tokens.

Supported Flags

FlagDescriptionExample
--resume SPEC-XXXResume interrupted implementation/moai run --resume SPEC-AUTH-001
--soloForce sub-agent mode/moai run SPEC-AUTH-001 --solo
--mode <value>Specify the dispatch axis/moai run SPEC-AUTH-001 --mode loop

Resume feature:

On re-run, work continues from the last successful stage checkpoint.

The --mode dispatch axis:

--mode is a separate axis that selects a /moai run workflow variant (distinct from Phase 4’s 4-mode execution catalog):

  • autopilot (default): scale-based selection in Phase 4, then run the implementation
  • loop: delegate to the Ralph engine’s diagnostic loop (see loop.md)
  • team: retired — raises MODE_TEAM_UNAVAILABLE and falls back to autopilot (Agent Teams static layer retired)
  • pipeline: rejected — returns the MODE_PIPELINE_ONLY_UTILITY error (pipeline mode is for utility subcommands only)

The DDD Cycle

/moai run executes three stages in order: ANALYZE -> PRESERVE -> IMPROVE. Let’s look at what happens in each stage.

1. ANALYZE

Reads the existing code and compares it against the SPEC requirements to figure out what needs to be done.

Analysis items:

ItemDescriptionExample
Code structureFiles, modules, dependencies“auth.py depends on user_service.py”
Domain boundariesScope of business logic“Separate the auth domain from the user domain”
Test statusExisting test coverage“Currently 45% coverage”
Technical debtAreas needing improvement“SQL injection vulnerability found”

2. PRESERVE

Records the current behavior of the existing code with characterization tests. These tests act as a safety net confirming that existing functionality still works the same after refactoring.

Info

What is a characterization test?

It does not judge “whether this code is right or wrong” — it records “this is how it currently behaves.”

For example, if the existing login function returns {"status": "success"} on success, this behavior is recorded as a test. Later, when you change the code, a failure in this test tells you immediately that “the existing behavior has changed.”

3. IMPROVE

Changes the code in small increments according to the SPEC requirements, running the tests each time to confirm the existing behavior is preserved.

Core principle: small changes + verify every time

flowchart TD
    A["Small code change"] --> B["Run tests"]
    B --> C{"All tests pass?"}
    C -->|Yes| D["Commit"]
    D --> E{"More changes
remaining?"} E -->|Yes| A E -->|No| F["Implementation complete"] C -->|No| G["Roll back the change"] G --> A

Execution Flow

The full process /moai run performs internally:

flowchart TD
    A["Run command
/moai run SPEC-XXX"] --> B["Invoke manager-spec"] B --> C["Build strategic plan"] C --> D{"User approval"} D -->|No| E["Exit"] D -->|Yes| F["Task decomposition
up to 10 tasks"] F --> G["Invoke manager-develop"] G --> H["ANALYZE
analyze code structure"] H --> I["Map dependencies"] I --> J["Check existing tests"] J --> K["PRESERVE
write characterization tests"] K --> L["Capture existing behavior"] L --> M["Establish test baseline"] M --> N["IMPROVE
start implementation"] N --> O["Apply small change"] O --> P["Run tests"] P --> Q{"Pass?"} Q -->|Yes| R["Commit"] R --> S{"All requirements
implemented?"} S -->|No| O S -->|Yes| T["Invoke sync-auditor"] Q -->|No| U["Roll back"] U --> O T --> V{"TRUST 5
quality criteria"} V -->|CRITICAL| W["Report quality issues
to the user"] V -->|PASS/WARNING| X["Git operations"] W --> Y{"Retry fixes?"} Y -->|Yes| N Y -->|No| Z["Exit"] X --> AA["Invoke manager-git"] AA --> AB{"Auto branch?"} AB -->|Yes| AC["Create feature branch"] AB -->|No| AD["Commit on current branch"] AC --> AE["Done"] AD --> AE

Phase Details

Phase 3: JIT Language Detection

Automatically detects the project’s primary language and injects the appropriate language skill when spawning agents. All 16 languages are supported equally.

Detected fileLanguage skill
go.modmoai-lang-go
package.json (typescript)moai-lang-typescript
pyproject.tomlmoai-lang-python
Cargo.tomlmoai-lang-rust
pom.xml / build.gradlemoai-lang-java

Phase 4: Scale-Based Mode Selection

Automatically selects the optimal execution mode based on the SPEC’s scale. Not running a heavy pipeline for a small task — that too is tokenomics.

PatternCriteriaExecution mode
Bug fixfiles ≤ 3, single domainFix Mode
Single featurefiles ≤ 5, single domainFocused Mode
In-domain featurefiles 5-10Standard Mode
Multi-domainfiles ≥ 10 or domains ≥ 3Full Pipeline

Harness Level Routing (quality-depth routing)

At the start of the run phase, the quality-pipeline depth is determined automatically by SPEC complexity.

LevelTargetevaluatorSkipped phases
minimalSimple bug fixes, config changesdisabled0, 0.5, 2.0, 2.5, 2.75, 2.8a
standardRegular feature development (default)final-pass (Phase 16 only)none
thoroughCritical features such as security/paymentsper-sprint (Phase 10 + 2.8a)none

Automatic escalation on failure: minimal → standard → thorough (up to 2 times)

Plan Audit Gate

The first mandatory gate that runs on entering /moai run. The plan-auditor sub-agent independently audits the SPEC artifacts authored in the plan phase.

  • plan-auditor is an agent independent of manager-spec — the agent that created the artifacts does not inspect its own results
  • If the SPEC-artifact hash has not changed and the previous verdict score is ≥ 0.90, it is skip-eligible (the cached verdict is reused)
  • Otherwise, plan-auditor re-runs and issues a new verdict
  • 3 verdicts: PASS / PASS-with-debt / FAIL
Warning
The Plan Audit Gate’s skip policy (skipping the plan-auditor re-run) is score-based. However, the Implementation Kickoff Approval below is a separate user-approval gate independent of score, and cannot be bypassed under any circumstances (REQ-ATR-015).

Implementation Kickoff Approval

A HUMAN GATE that obtains the user’s explicit approval after passing the Plan Audit Gate and before starting implementation.

  • Presents the plan-auditor verdict summary + the SPEC artifacts to the user
  • Presents 3 options via AskUserQuestion: “enter run / additional review / abort”
  • Even if the score is ≥ 0.90, and even if it is PASS-with-debt, this approval is not skipped
  • The implementation phase begins only after user approval

Phase 1: Analysis and Planning

The manager-develop subagent performs the following:

  • Fully analyzes the SPEC document
  • Extracts requirements and success criteria
  • Identifies implementation stages and individual tasks
  • Determines tech stack and dependency requirements
  • Estimates complexity and effort
  • Produces a detailed execution strategy with a staged approach

Output: an execution plan including plan_summary, a requirements list, success_criteria, and effort_estimate

Phase 6: Task Decomposition

Breaks the approved execution plan into atomic, reviewable tasks:

Task structure:

  • Task ID: sequential within the SPEC (TASK-001, TASK-002, etc.)
  • Description: a clear task statement
  • Requirement Mapping: the SPEC requirement it satisfies
  • Dependencies: list of prerequisite tasks
  • Acceptance Criteria: how completion is verified

Constraint: at most 10 tasks per SPEC. If more are needed, splitting the SPEC is recommended

The task decomposition result is persistently recorded in .moai/specs/SPEC-{ID}/tasks.md. It is trackable via Git and referenced by the Drift Guard.

Phase 10: Sprint Contract (thorough only)

Runs only at the thorough level. The Done criteria are pre-agreed with sync-auditor before implementation.

Contract contents:

  • Specific test cases that must pass
  • Identified edge cases
  • Hard thresholds (coverage %, performance targets, security requirements)

After up to 2 rounds of negotiation, the evaluator’s recommendation is finalized.

Phase 2: DDD Implementation

The manager-develop subagent runs the ANALYZE-PRESERVE-IMPROVE cycle:

Requirements:

  • Initialize work tracking
  • Run the complete ANALYZE-PRESERVE-IMPROVE cycle
  • Verify existing tests pass after each transformation
  • Create characterization tests for uncovered code paths
  • Achieve test coverage of 85% or higher

Output: files_modified, characterization_tests_created, test_results, behavior_preserved, structural_metrics

Phase 13: Quality Verification

The sync-auditor subagent performs TRUST 5 verification:

TRUST 5 pillarVerification items
TestedTests exist and pass, DDD discipline maintained
ReadableProject conventions followed, docs included
UnifiedFollows existing project patterns
SecuredNo security vulnerabilities, OWASP compliant
TrackableClear commit messages, supports history analysis

Additional verification:

  • Test coverage 85% or higher
  • Behavior preservation: existing tests pass unchanged
  • Characterization tests pass: behavior snapshots match
  • Structural improvement: coupling and cohesion metrics improved

Output: trust_5_validation results, coverage_percentage, overall_status (PASS/WARNING/CRITICAL), issues_found

Phase 19: sync-auditor Independent Audit

At the thorough level, the sync-auditor subagent performs a 4-dimension (Functionality/Security/Craft/Consistency) active evaluation and TRUST 5 static verification. An independent auditor — not the agent that built it — judges quality.

Warning
Security FAIL = overall FAIL. After up to 3 fix-evaluate cycles, the result is reported to the user.

Drift Guard (scope-deviation detection)

When the DDD/TDD cycle completes, actual changes are compared against the plan:

  • drift ≤ 20%: informational record only
  • 20% < drift ≤ 30%: warning
  • drift > 30%: triggers the Phase 14 replanning gate

Phase 19: Git Operations (conditional)

The manager-git subagent performs Git automation:

Runs when:

  • quality_status is PASS or WARNING
  • If git_strategy.automation.auto_branch is true, a feature branch is created
  • If auto_branch is false, commits go directly to the current branch

Phase 20: Completion and Guidance

The user is presented with the following options:

OptionDescription
Sync documentationRun /moai sync to generate docs and a PR
Implement another featureCreate an additional SPEC with /moai plan
Review the resultsCheck the implementation and test coverage locally
DoneEnd the session

The Token Saver — spec-compact.md

On run-phase entry, the SPEC summary is auto-loaded, saving ~30% of tokens. If .moai/specs/SPEC-{ID}/spec-compact.md exists, it is used instead of the full spec.md.

Quality Gates

When implementation is complete, all of the following quality criteria must pass:

ItemCriterionDescription
LSP errors0No type-checker or linter errors
Type errors0No type errors from pyright, mypy, tsc, etc.
Lint errors0No linter errors from ruff, eslint, etc.
Test coverage85%+Code test coverage target
Behavior preservation100%All characterization tests pass
Info

Why is 85% coverage the target?

Why 85% instead of 100%

100% is unrealistic and can lead to meaningless tests. At 85%, most of the core logic is tested. The remaining 15% is code that is hard to test, such as config files and error handlers.

Worked Example

Example: Implementing SPEC-AUTH-001

Step 1: SPEC created in the Plan phase

bash
> /moai plan "JWT-based user authentication: signup, login, token refresh"
# SPEC-AUTH-001 created

Step 2: Clean up tokens, then start implementation

bash
> /clear
> /moai run SPEC-AUTH-001

Step 3: What manager-develop does automatically

The 4 phases the manager-develop agent runs to implement the SPEC.


Phase 1: Strategic Planning

Analyzes the SPEC document and builds an implementation strategy.

bash
Phase 1: Strategic planning
- SPEC document analysis complete
- 5 requirements extracted
- Decomposed into 7 tasks (TASK-001 ~ TASK-007)
- Estimated complexity: medium

Phase 6: Task Decomposition

Breaks the implementation work into fine-grained units.

bash
Phase 6: Task decomposition
- TASK-001: Define the user model
- TASK-002: Password hashing utility
- TASK-003: JWT token creation/verification
- TASK-004: Signup API
- TASK-005: Login API
- TASK-006: Token refresh API
- TASK-007: Input validation middleware

Phase 2: DDD Implementation

Implements safely with the ANALYZE-PRESERVE-IMPROVE cycle.

ANALYZE stage - understand the existing code:

bash
ANALYZE stage:
- Analyzed existing code structure: src/auth/ (4 files)
- Checked test coverage: currently 32%
- Mapped dependencies: bcrypt, PyJWT, SQLAlchemy

PRESERVE stage - protect the existing behavior:

bash
PRESERVE stage:
- Wrote 12 characterization tests
- Captured existing behavior
- Established test baseline: 32%

IMPROVE stage - implement incrementally:

bash
IMPROVE stage:
- Iteration 1: TASK-001 user model (tests pass)
- Iteration 2: TASK-002 password hashing (tests pass)
- Iteration 3: TASK-003 JWT tokens (tests pass)
- Iteration 4: TASK-004 signup API (tests pass)
- Iteration 5: TASK-005 login API (tests pass)
- Iteration 6: TASK-006 token refresh (tests pass)
- Iteration 7: TASK-007 input validation (tests pass)

Phase 13: Quality Verification

Verifies quality against the TRUST 5 pillars.

bash
Phase 13: Quality verification
- All TRUST 5 pillars pass
- Test coverage: 89%
- LSP errors: 0
- Type errors: 0
- Characterization tests: 12/12 pass
- New tests: 24/24 pass
- Status: PASS

Phase 19: Git Operations

Creates commits with Conventional Commits.

bash
Phase 19: Git operations
- Branch: feature/SPEC-AUTH-001
- 7 commits created (Conventional Commits)

Phase 20: Completion

Once implementation is complete, you are guided to the next step.

bash
Phase 20: Completion
- Implementation complete
- Next step: /moai sync

Step 4: Move to the Sync phase after implementation completes

bash
> /clear
> /moai sync SPEC-AUTH-001

Frequently Asked Questions

Q: In a new project with no existing code, what happens to the PRESERVE stage?

If there is no existing code, the PRESERVE stage is passed through quickly. Tests for the new code are written together in the IMPROVE stage.

Q: Which cycle applies — TDD or DDD?

It follows the development_mode setting in quality.yaml. TDD (RED-GREEN-REFACTOR) suits new feature development, while DDD (ANALYZE-PRESERVE-IMPROVE) suits refactoring existing projects with low test coverage.

Q: What if I run out of tokens mid-implementation?

The manager-develop agent saves progress automatically. After /clear, run /moai run SPEC-XXX again and it continues based on the SPEC document.

Q: What if reaching 85% test coverage is difficult?

You can adjust the coverage target in quality.yaml, but this is not recommended. 85% is the minimum bar guaranteeing that core logic is tested. If coverage falls short, manager-develop automatically adds the missing tests.

Q: What happens if Phase 13 returns a CRITICAL status?

The quality issues are reported to the user, and you are asked whether to retry fixes. Choosing “yes” returns to the IMPROVE stage and continues fixing.

Q: What is the difference between /moai run and /moai?

/moai run performs implementation only, based on an already-created SPEC. /moai automatically runs the entire workflow from SPEC creation through implementation to documentation.

Kanban Mode — run a SPEC all the way through (v3.1)

/moai run drives a single phase. The sync step after it requires the user to issue another command. Kanban Mode is the entry switch that automates this “chaining”. Start the session launcher with --kanban, and the three phases — plan → run → sync — are chained automatically under the lead session’s coordination.

bash
# Enter one SPEC in Kanban Mode — all the way through to completion
$ claude --kanban SPEC-AUTH-001

The four human gates (implementation kickoff approval, the verify CRITICAL/HIGH decision, and two sync gates) still fire as-is. Kanban Mode does not “skip human gates”; it automates the “round-trip between phases”. It is rejected by the mixed-backend launcher (moai cg), and it runs within a four-hour wall-clock ceiling. The detailed contract and the four-phase flow are covered in Kanban Mode.